Case Studies


  • 77 High Street, Thames Ditton

    77 High Street, Thames Ditton

    Location Thames Ditton, Surrey SPD’s role Project management and QS Project type Commercial to residential Development One-bedroom apartment Planning route Permitted development Site condition Occupied flat above Project overview An unloved office turned into a ground-floor home This commercial-to-residential conversion case study shows how Syndicate Property Development (SPD) provided project management and quantity surveying to…

    Read this Case Study

  • The Range, Brunel Park, Reading

    The Range, Brunel Park, Reading

    Location Brunel Park, Reading SPD’s role Cost management Floor area c. 3,500 m² Programme 18 weeks Units combined 4 former shops Build cost Within budget ceiling Project overview Four shop units, one new Range store This retail conversion cost management case study shows how Syndicate Property Development (SPD) provided cost management on the conversion of…

    Read this Case Study

  • Retail Fit-Out Cost Management: Homebase to The Range, Upton

    Retail Fit-Out Cost Management: Homebase to The Range, Upton

    Client CDS Superstores International SPD’s role Cost management Project value £1m+ Programme 8 weeks Floor area c. 5,000 m² Public opening 22 May 2026 SPD’s role Cost management on a fast-track retail conversion This retail fit-out cost management case study shows how Syndicate Property Development (SPD) provided cost management on the conversion of the former…

    Read this Case Study

  • Working With Timber Frame Builds

    Working With Timber Frame Builds

    Timber frame structures are commonly used for residential forms of house building. Typically used for single or two storey dwellings. They offer faster builds as they are constructed offsite at a secure and dry facility and assembled back on location.

    Read this Case Study

  • Constructing a Container Build

    Constructing a Container Build

    The project was to procure a container and construct a plant room for a local authority new build project. It needed to be empathetic to the local environment and built without disrupting the existing operations of the main building.

    Read this Case Study

  • Constructing a CLT Build

    Constructing a CLT Build

    The project was to build a residential two storey building, housing ten one-bedroom apartments constructed using sustainable material in Austria and then delivered, prefabricated, to the UK. A CLT frame building was the method of choice.

    Read this Case Study